Thursday, September 15, 2016

Vanier sewer replacement update

Just like the Glebe, Westboro, Little Italy and most recently Rideau Street, Montreal Road through Vanier will soon have their sewers replaced and street-scape modified.  From the City of Ottawa.....

·         The 2016 Trenchless Sewer Lining Program (East) is currently in the preliminary design stage.  The City of Ottawa anticipates that sewer lining on Montreal Road, between North River Road and L’Eglise Street, will occur during the first half of 2017.   
·         An integrated road, sewer and watermain rehabilitation project is planned on Montreal Road between North River Road and St. Laurent Boulevard. The work will consist of road resurfacing/reconstruction, sidewalk reconstruction, streetscaping, watermain replacement and only specific sections of existing sanitary sewers (38 m west of Ducharme Blvd. to L’Eglise St. and L’Allemand St. to Lajoie St.). This project is currently in the planning stages and design is scheduled to take place in 2017 / 2018 and be constructed in the 2019 to 2021 timeframe.

1 comment:

  1. Wha! This is great full blog i like this type blog. Deferentially this blog have this quality big cost, special effects, thank for sharing this blog.
    design Luxury LOGO for your Real Estate Business

    ReplyDelete